Irrigation pond

Project Description

Works for the execution of an irrigation pond of loose materials with an internal slope of 2.3H:1V, a crown walkway of 4.5 m wide and external slopes of 1H:1V in cut and 1.5H:1V. Waterproofed by means of high density polyethylene on geotextile.
The capacity of said reservoir is 114,088.5 m3 due to the regulation needs required by the applicant's agricultural operation.

The work for the Project and the Construction Management has included:
The general description of the works, the instructions for execution, the conditions that the materials must meet, measurement and payment of the work units; as well as the layout and topographic monitoring of the work and the supervision and certification of the works.

The main tasks related to security coordination have been:
Special attention to the signage of the works.
Supervision of the use of earthmoving machinery to ensure it is in suitable condition for the work to be carried out. Acoustic signals must be in perfect working order.
Use of machinery for the tasks for which it has been designed.
Site visits to the pool are prohibited while the machinery is working.

Project Details

Date: 10/01/2016

Customer: Agrofruits Levante S.L.

Duration: 4 meses


By browsing this website, you agree to our privacy policy.
I Agree